Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
Permit Number - T07PL02154
Inspection Description - PLUMBING - GAS PRESS TEST FNL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2008 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
| 12/27/2007 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) HAVE MINIMUM 10 PSI AIR TEST ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION TO HOLD WITH NO LOSS OF PRESSURE FOR 15 MINUTES 2) PROVIDE PIPE PRIMER (YELLOW GLUE LIKE MATERIAL) THEN DBL WRAP ALL TOOL MARKS AND FITTINGS THAT ARE UNDERGROUND WITH 20 MIL TAPE 3) PROVIDE RIDGID NIPPLE THRU APPLIANCE HOUSING AT FURNACE GAS ENTRY 4) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO BE APPROVED PIPING MATERIAL AND GRAVITY DRAIN TO DAY LIGHT. NO FLEX, GO DOWNWARD FROM PRESSURE RELIEF DEVICE AND NOT TRAP WATER 5) VENTS FROM WATER HEATER AND FURNACE TO BE EXTENDED TO 3' ABOVE TOP OF COLLER INTAKE WHEN WITHIN 10' OF COOLER WITH APPROVED DBL WALL VENT PIPING AND VENT CAP |