Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07PL02109


Addresses:

9047 S RITA RD


Inspection Status: Approved

Inspection History: SITE - SEWER

Permit Number - T07PL02109

Inspection Description - SITE - SEWER

Inspection Status - Approved

Date Description Inspector Results Comments
10/31/2008 SITE - SEWER Approved IVRS - Inspection :*
07/18/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
PLEASE USE THIS PERMIT FOR ALL EXTERIOR SITE SEWER INSPECTIONS

AIR TESTING FROM MANHOLE #28 TO #29 OK
#29 TO #30 OK
#16 TO #25 OK
#25 TO #26 OK
AIR TESTING COMPLETE
VACUUM TESTING COMPLETE

NEED PCDEQ AUTHORIZATION TO DISCHARGE AND OR FROM PIMA COUNTY BEFORE ANY DISCHARGE FROM THE BUILDING.
06/25/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE #26 STACKED
4" SEWER FROM BLD. THRU 2-WAY CLEANOUT
TURNS SOUTH TO AREA OF SEPTIC TANK WATER TEST OK
06/20/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
INSPECTION ON 6/17/08 & 6/18/08 IS FOR MANHOLE #16
TO MANHOLE #25, PIPING COMPLETE FROM MANHOLE #16
TO #25, #25 BASE POURED
06/18/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR 35 CONTINUOUS EAST FROM MANHOLE #16 TOWARD
#17 APP 120' WEST OF MANHOLE #17 BEDDING, LAYING, TRACER, SHADING
06/17/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR 35 FROM PUBLIC MANHOLE #16 UPSTREAM TOWARD MANHOLE #17 WITH TRANSITION TO DUCTILE AND BACK TO SDR 35 PER PLAN ADD 85'
BEDDING, LAYING, TRACER, SHADING
06/13/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
NOT READY ON SITE FOR INSPECTION
05/30/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED
05/22/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
05/21/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
AIR TESTING MANHOLE #26 TO #27 & #27 TO #28 OK
NO LOSS
05/20/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
HCS CONNECTION AT BLD. FROM MANHOLE #26 & #28 OK
THERE SHALL BE NO DISCHARGE INTO SITE SEWER UNTIL YOU HAVE PCDEQ AUTHORIZATION TO DISCHARGE FORM COMPLETED AND SEEN BY INSPECTOR
05/14/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
1. PIPING FROM MANHOLE #26 TO #27 OK
2. MANHOLE #27 POURED & STACKED
3. 6" HCS LATERAL FROM MANHOLE #28 TO BLD. AIR TEST OK
4. 6" HCS LATERAL FROM MANHOLE #26 TO BLD. AIR TEST OK
05/13/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
05/07/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR35 FROM MANHOLE #26, 150' EAST TOWARD #27
BEDDING, LAYING, TRACER, SHADING OK
05/06/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
EXCAVATION FOR MANHOLE #26 TO #27 WITH EXCAVATION FOR HCS FROM MANHOLE TO BLD.
04/04/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE #28 POURED & STACKED, #29 & #30 POURED
OK TO STACK & BACKFILL
04/03/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
BEDDING, LAYING, TRACER, SHADING FROM
MANHOLE #29 TO #30 OK
04/02/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR 35 FROM MANHOLE #27 TO #28 TO #29 BEDDING, LAYING, TRACER OK
EXCAVATION COMPLETE MANHOLE #29 TO #30
8" SDR BEGINNING FROM #29 TO #30