Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SUPPORT & SECURE WATER PIPING TO WATER HEATER PROPERLY 2. COMPLETE INSULATION AND SEAL PROPERLY 3. SECURE ENCLOSURE TO PAD & STRUCTURE 4. SEAL GAS PIPING PENETRATION INTO BUILDING |
|
| 12/06/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SHALL PROVIDE MINIMUM 100 SQ. INCHES UPPER & LOWER COMBUSTION AIR IN DOOR WITHIN UPPER & LOWER 12" OF DOOR FOR WATER HEATER COMBUSTION AIR INTAKE OR PROVIDE FROM EXTERIOR OF BUILDING WITHIN 12" OF CEILING SPACE MINIMUM 3" X 8" OPENING FOR UPPER COMBUSTION AIR INTAKE. HAVE NEW RELOCATED WATER HEATER ADDED TO THIS PERMIT. |