Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/12/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #4 ABOVE & COMPLY 2. PROVIDE PROTECTION PLATES FOR WATER PIPING AT WATER HEATER LOCATION PRIOR TO COVERING 3. SHALL SEE FINAL INSTALL OF PLUMBING TRIM WITH CORRECT ACCESS FOR WHIRLPOOL TUB PUMP. |
|
| 12/10/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE MINIMUM 10' METALLIC PIPING AT SERVICE ENTRY RECONNECT BONDING CLAMPS 2. COMPLETE ALL INSTALLS WITH TEST ON PIPING AND NEW TUB PIPING 3. PROVIDE HOT & COLD SEPARATION 4. PROVIDE SIGNAGE IN ELECTRICAL PANEL NON-BONDED PLASTIC WATER PIPING. |