Permit: T07PL02024

Parcel: 135030050

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
12/09/2010 PLUMBING - FINAL Approved IVRS - Inspection :*
1) IF YOU ARE NEEDING A GAS CLEARANCE. THEN I WILL NEED TO INSPECT SYSTEM
12/18/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
PROVIDE BONDING PER NOTE #5 FROM 12/10/07 INSPECTION
12/10/2007 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. TIE IN YARD PIPING TO EXISTING BUILDING PIPING AND TEST ENTIRE GAS SYSTEM
2. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES
3. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPING FROM WATER HEATER/FURNACE
4. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN SHALL BE APPROVED PIPING MATERIAL (CPVC, COPPER, GALVANIZED PIPE) GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN 6" TO 24" FROM FINISH GRADE ELEVATION
5. PROVIDE BONDING OF BUILDING GAS PIPING