Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE LEFT GAS CARD |
|
| 11/09/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SECURE PIPING W/PIPE SUPPORTS CPVC WOULD BE OK FOR T&P |
|
| 11/07/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL SECURE PIPING ON EXTERIOR TO STRUCTURE PROPERLY 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN 6" TO 24" FROM FINISH GRADE 3. SHALL MAKE UP WATER HEATER VENT CORRECTLY AND PROVIDE 3-GALV SCREWS AT ALL VENT JOINTS FOR FURNACE AND WATER HEATER 4. PROVIDE BONDING OF BUILDING GAS PIPING NOTE: NEW WATER HEATER WOULD REQUIRE PERMIT |