Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/18/2008 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 04/21/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. YOU REQUIRE A PETITION OF APPEAL TO BE ON SITE AT TIME OF INSPECTION -- REQUIRE A 90 DEG. TURN DOWN AT PRESSURE RELIEF VALVE -- NO THREADED END -- REQUIRE AVB'S ON HOSE BIBBS -- ATMOSPHERIC VACUUM BREAKERS 2. 3/4" CXMIP ADPT 3. 3/4" CXFTG ST 90 DEG. |
|
| 01/18/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - VENT TO BE APPROVED TYPE - T&P RELIEF NOT APPROVED - GAS VALVE NOT APPROVED - NO BOND BETWEEN GAS AND WATER - REQUIRE DIELECTRIC PROTECTION BETWEEN UPPER & GALVANIZED |