Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/17/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* TEST TO HOLD WITH NO LOSS OF PRESSURE |
|
| 10/16/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE 1" RISER AT METER PRIMED, PRIME & TAPE TOOL MARKS & FITTINGS 2. TEST GAS SYSTEM IN ITS ENTIRETY 3. PROVIDE BONDING OF BUILDING GAS PIPING 4. PROVIDE RIDGID NIPPLE THRU APPLIANCE HOUSING (FURNACE) 5. PROVIDE MINIMUM 100 SQ. INCHES UPPER & LOWER COMBUSTION AIR FOR WATER HEATER. |