Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/20/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/10/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REPLACE YOUR LEAKING TEMPERATURE AND PRESSURE RELIEF VALVE 2) INSTALL THE MISSING SCREWS AT THE JOING BETWEEN THE 2 ADJUSTABLE ELBOWS 3) YOUR RELIEF VALVE IS RUNNING SO I TURNED OFF THE WATER CONTROL VALVE AT THE HEATER 4) YOU CAN TURN IT BACK ON TO USE IT |
|
| 11/01/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) VENT FROM WATER HEATER TO BE APPROVED DBL WALL LEAVING ENCLOSURE TO POINT OF TERMINATION AT APPROVED VENT CAP-PROPERLY SECURED 2) GAS FLEX CANNOT PENETRATE THRU ENCLOSURE, SHALL BE RIDGID PIPING INTO ENCLOSURE 3) NOTE: FOR PROTECTION OF BLDG AND OCCUPANTS PIPING GOING INTO BLDG SHOULD BE MADE INSECT AND WEATHER TIGHT INTO BLDG |
|
| 09/20/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS AT 9:41 |