Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/17/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* BUILDING SEWER OK 1. SHALL PROVIDE CAST IRON DWV PIPING ON EXTERIOR FOR SINK DRAIN EXPOSED TO SUNLIGHT 2. SHALL SECURE DRAIN ARM FOR WASHING MACHINE DRAIN AND PROVIDE LATEX PAINT ON EXTERIOR PIPE |
|
| 08/16/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. UNCOVER HCS TIE IN 2. REPAIR LEAKS 3. PROVIDE TRACER WIRE ON ALL ABS PIPING 4. INSTALL TRACER WIRES TO PIPING 5. FULL SIZE CLEANOUT FOR LOT LINE CLEANOUT |