Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2007 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 08/02/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE 10 PSI TEST ON ENTIRE GAS SYSTEM WITH NO PRESSURE LOSS FOR 15 MINUTES. USE TEST GAUGE IN 1/10TH POUND INCREMENTS. 2. EXPOSE AREA OF REPAIR IF REPAIR HAS BEEN MADE FOR INSPECTION 3. PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 4. PROVIDE BONDING OF BUILDING GAS PIPING 5. VENT FROM WATER HEATER TO BE DOUBLE WALL VENT PIPING LEAVING ENCLOSURE TO POINT OF APPROVED VENT CAP PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT PIPING 6. SHALL HAVE PIPE PENETRATING THRU WATER HEATER ENCLOSURE. |
|
| 08/01/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |