Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 07/30/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/26/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* NO ACCESS AT 9:21 UNABLE TO DO PM INSPECTION DUE TO WORK LOAD. |
|
| 07/25/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE TEST AT TIME OF INSPECTION ON ENTIRE GAS SYSTEM WITH NO LOSS OF PRESSURE 2. ALL FITTINGS & TOOL MARKS TO BE PRIMED AND THEN 10MIL TAPED ON UNDERGROUND PIPING. 3. SHALL PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVES AND SEDIMENT TRAPS AT ALL APPLIANCES. 4. REMOVE TAPE FROM WYE FITTING ON VENT CONNECTOR IT SHALL BE FUNCTIONAL FITTING WITH NO REDUCTION IN SIZE FROM FURNACE VENT SIZE. ALL FITTINGS ON VENT PIPING TO HAVE 3-GALV SCREWS AT EACH JOINT. VENT PIPING THRU CEILING & ROOF TO BE FULLSIZE DOUBLE WALL TERMINATING 3' ABOVE COMBUSTION AIR INTAKE WITH APPROVED DOUBLE WALL VENT CAP. |