Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1. PROVIDE DOUBLE WALL FLUE VENT AND CAP ON ROOF 2. CALL BACK FOR FINAL 03090 |
|
| 07/16/2007 | PLUMBING - GAS PRESSURE TEST | Cancelled | IVRS - RI canceled | |
| 07/16/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. COMPLETE LIST #35, #6, #9 AND CALL FOR FINAL 2. PRESSURE TEST OK |
|
| 07/12/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. UNCOVER ALL UNDERGROUND GAS PIPING FOR INSPECTION 2. PROVIDE PRIMER AND TAPE ON ALL TOOL MARKS AND FITTINGS 3. PROVIDE AGA APPROVED VALVES AND FLEXES ON WATER HEATER AND STOVE. 4. PROVIDE SUPPORT ON ALL GAS PIPING ABOVE GROUND 5. PROVIDE APPROVED FLUE VENT FOR WATER HEATER 6. EXTENDED FLUE VENT ON ROOF 3' ABOVE COOLER WITH DOUBLE WALL FLUE VENT AND CAP 7. PROVIDE NEW PRESSURE TEST 8. PROVIDE SEDIMENT TRAP AT WATER HEATER 9. PROVIDE ELECTRICAL BONDING FOR GAS PIPING |