Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T07PL01134
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/19/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTE: #1 7/11/07 INSPECTION AND SECURE PIPING AT METER 2) NOTE: BOTH NORTH AND SOUTH WATER HEATERS REQUIRE SEPERATE PERMITS WITH UTILITY DESCRIPTION, PRESSURE TESTING AT TIME OF INSPECTION, WITH CORRECT RATED FLEXS OR HARD PIPE TO OBTAIN GAS CLEARANCE CARDS |
|
| 07/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BONDING OF BUILDING GAS PIPING 2. APPLIANCE TO BE VENTED CORRECTLY 3. VENT TERMINATION TO BE 3' ABOVE TOP OF COOLER INTAKE |