Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/20/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PIPING HAS BEEN COVERED WITHOUT APPROVAL IN YARD CONTRACTOR TO PAY REFEE PRIOR TO FINAL INSPECTION SEE NOTE #6 THIS SHEET, EXPOSE PIPING FOR INSPECTION. |
|
| 07/09/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PETITION OF APPEAL #340-07 ON SITE COMPLY WITH NOTE #6 FOR BUILDING GROUND OR YOU SHALL BE REFEE'D |
|
| 07/03/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL PIPING TO BE SUPPORTED & SECURED PROPERLY I.E WATER HEATER LOCATION 2. WATER PIPING AND ALL FLAMMABLES TO BE MINIMUM 1" CLEARANCE FROM DOUBLE VENT & 6" FROM SINGLE WALL VENT. 3. REMOVE MATERIAL FROM WYE VENT FITTING FOR INSPECTION & VERIFY CORRECT VENTING OF WATER HEATER/FURNACE 4. PROVIDE SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER 5. SHALL PROVIDE WATER HAMMER ARRESTORS FOR HOT & COLD SUPPLY TO WASHING MACHINE. 6. SHALL PROVIDE MINIMUM 10' OF METALLIC PIPING FOR BUILDING GROUND AT EXTERIOR YARD LOCATION 7. SHALL PROVIDE NIPPLE ON DISCHARGE END OF 125# PRESSURE RELIEF WITH NO THREADS ON DISCHARGE END 8. SHALL PROVIDE CITY SIGNED PETITION OF APPEAL FOR WATER HEATER INSTALLATION ON SITE. 9. PROVIDE SEPARATION OF HOT & COLD TUBING 10. VENT FROM WATER HEATER FURNACE TO BE 3' ABOVE TOP OF INTAKES WITHIN 10' WITH DOUBLE WALL VENT PIPE AND CAP |