Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T07PL01113
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD AT METER |
|
| 07/03/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SHALL PROVIDE CORRECT VENT FOR FRONT BUILDING WATER HEATER/FURNACE THRU ROOF (DOUBLE WALL AND CEILING) TERMINATING 3' ABOVE TOP OF AIR INTAKE WITH APPROVED DOUBLE WALL VENT CAP |
|
| 07/02/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTE #9 THIS SHEET AND PROVIDE FULLSIZE VENT PIPING AND APPROVED VENT CAP |
|
| 06/29/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* OWNER CANCELLED |
|
| 06/27/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE CITY APPROVED PLAN OF ACTUAL INSTALLATION WITH SIZING & SUB METER TO GUEST HOUSE 2. SHALL SEAL GAS ENTRY INTO BUILDINGS 3. BONDING SHALL BE TO BUILDING SIDE OF GAS PIPING 4. EXPOSE UNDERGROUND PIPING AT RISER LOCATIONS AND ALL NEW PIPING AS WELL AS EXISTING TO BE POTHOLED RISERS SHALL BE PRIMED & THEN TAPED INCLUDING FITTINGS AND TOOL MARKS. UNDERGROUND PIPING SHALL BE FACTORY COATED PIPING. 5. PROVIDE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPING. 6. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCE LOCATIONS 7. PROVIDE GRAVITY DRAIIN FOR WATER HEATER IN FRONT HOUSE 8. PROVIDE SEDIMENT TRAP AT WATER HEATER IN FRONT HOUSE 9. VENT FROM WATER HEATER FURNACE IN FRONT HOUSE TO BE EXTENDED UP WITH DOUBLE WALL VENT PIPING 3' ABOVE AIR INTAKES WHEN WITHIN 10' OF AIR INTAKE. |