Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GASTO FURNACE/WATER HEATER ONLY OK SW GAS 889-1888 |
|
| 06/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. GAS PIPING TO FIREPLACE REQUIRES CONTROL VALVE OUTSIDE OF THE HEARTH WITHIN 6' IN THE SAME ROOM AS FIREPLACE. 2. WATER HEATER SHALL HAVE VENT CONNECTED CORRECTLY HAVE 3-GALV SCREWS AT EACH JOINT, REMOVE DUCT TAPE AT SINGLE TO DOUBLE WALL CONNECTION TO KEEP DRAFT SPACE CLEAR. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING MATERIAL. EXPOSE TERMINATION. 4. PRIMER THEN TAPE ALL TOOL MARKS & FITTINGS BELOW GRADE |