Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/15/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE BONDING OF BLDG GAS PIPING 2) VENTS FROM WATER HEATER AND FURNACE SHALL TERMINATE 3' ABOVE TOP OF COMBUSTION AIR INTAKE OR COLLER INTAKE WHEN WITHIN 10' OF INSTALLS WITH DBL WALL VENT PIPING (FULL SIZE) AND VENT CAP 3) SHALL PROVIDE SEDIMENT TRAPS ON GAS ENTRY TO WATER HEATER AND FURNACE 4) SHALL PROVIDE ROOF FLASHING ON PIPE PENETRATIONS THRU ROOF MADE WEATHER TIGHT 5) GAS PIPING AT METER TO BE SECURED AND SUPPORTED. GAS PIPING ON ROOF TO BE UP OFF ROOF ON SUPPORTS THAT ARE WEATHER RESISTANT AND SECURED TO PIPING AND TARED TO ROOF 6) GAS PIPING TO BE COMPLETED TO WATER HEATER AND FURNACE WITH AGA OR CSA APPROVED GAS VALVES 7) VENTS FROM WATER HEATER AND FURNACE TO BE MADE UP CORRECTLY HAVE 3 GALV SCREWS AT EACH JOINT 8) WATE HEATER TEMPERATURE AND PRESSURE RELIEF VALVE SHALL HAVE DRAIN PIPING FULL SIZE APPROVED MATERIAL GRAVITY DRAIN TO DAYLIGHT TERMINATING 90 DEGREE DOWN 6" TO 24" FROM FINISH GRADE |