Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/12/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - PIPE SUPPORTS ON ROOF SHALL BE WEATHER RESISTANT SUCH AS REDWOOD OR PRESSURE TREATED AND SHALL BE SECURED W/TAPE. - SECURE HORIZONTAL PIPING BETWEEN WALL AND METER W/STABLE PIPE SUPPORTS. UPC REQUIRES ALL PIPING TO BE SECURED AT EACH END AND AT CHANGES OF DIRECTION. - REAPPLY PRESSURE FOR INSPECTION TIE OFF LADDER TO RAIL |
|
| 07/10/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 15 PSI ON SYSTEM SUPPORT PIPING NEAR METER PROVIDE ACCESS TO ROOF FOR INSPECTION ALL PIPING REQUIRED TO BE SUPPORTED AGA SOV REQUIRED |