Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07PL01052

Parcel: 133425410

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
07/13/2007 PLUMBING - FINAL Approved IVRS - Inspection :*
07/12/2007 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
- PIPE SUPPORTS ON ROOF SHALL BE WEATHER RESISTANT SUCH AS REDWOOD OR PRESSURE TREATED AND SHALL BE SECURED W/TAPE.
- SECURE HORIZONTAL PIPING BETWEEN WALL AND METER W/STABLE PIPE SUPPORTS. UPC REQUIRES ALL PIPING TO BE SECURED AT EACH END AND AT CHANGES OF DIRECTION.
- REAPPLY PRESSURE FOR INSPECTION
TIE OFF LADDER TO RAIL
07/10/2007 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
15 PSI ON SYSTEM
SUPPORT PIPING NEAR METER
PROVIDE ACCESS TO ROOF FOR INSPECTION
ALL PIPING REQUIRED TO BE SUPPORTED
AGA SOV REQUIRED