Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/15/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. PROVIDE MINIMUM 1" CLEARANCE TO COMBUSTIBLE MATERIALS AT WATER HEATER 2. PROVIDE DOUBLE WALL PIPE THROUGH ROOF |
|
| 11/06/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE PIPE PRIMER THEN 10 MIL TAPE ALL TOOL MARKS, FITTINGS ON UNDERGROUND PIPING 2. SHALL PROVIDE AGA OR CSA APPROVED GAS VALVES & NEW GAS FLEXES AT APPLIANCES 3. CAP OFF OLD PIPING 4. PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER VENT PIPING, WITH MINIMUM 1" CLEARANCE FROM COMBUSTIBLES AT DOUBLE WALL THRU ROOF PENETRATION. 5. PROVIDE FULL SIZE TEMPERATURE & PRESSURE RELIEF DRAIN OF APPROVED MATERIALS 6. SHALL PROVIDE ROOF FLASHINGS AT PENETRATIONS THRU ROOF MADE WEATHERTIGHT 7. PROVIDE EMERGENCY SHUT OFF VALVE AGA OR CSA AT BUILDING SERVICE ENTRY 8. SECURE GAS PIPING ON ROOF AND SUPPORT AT 8' INTERVALS AND CHANGES OF DIRECTION NOTE: MINIMUM 12" COVER ON UNDERGROUND PIPING REQUIRED. LIST MAY NOT BE COMPLETE RETEST & REINSPECTION |