Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CORRECTIONS MADE OK PROVIDE CERTIFICATION OF NEW RPPBP OK TO BACKFILL |
|
| 06/20/2007 | PLUMBING - FINAL | Not ready for Inspection | 1. EXTEND FULLSIZE ALL THE WAY TO THE VALVE AT THE METER. REDUCE AT THE VALVE. 2. PIPING COVERED AT BLDG 3. RPPBP TO BE THE SAME SIZE AS THE YARDWATER PIPING RPPBP IS FAILING (LEAKING) |