Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/27/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* TEST SHALL HOLD WITH NO LOSS OF PRESSURE |
|
| 06/13/2007 | PLUMBING - GAS PRESSURE TEST | Cancelled | CANCELLED PER HOMEOWNER COLETTE RYAN #747-1813 | |
| 06/13/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 06/12/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE TEST ON ENTIRE GAS SYSTEM WITH NO LOSS OF PRESSURE 2. PROVIDE 1" MINIMUM CLEARANCE FROM DOUBLE WALL VENT AND COMBUSTIBLE MATERIALS 3. PROVIDE CORRECT TRANSITION FROM COPPER TO GALV ON HOT WATER PIPING AT WATER HEATER. |