Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T07PL00854
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Partial Approval
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 15 PSI TEST FROM METER THRU EXISTING WITH REPAIR AT BUILDING SERVICE ENTRY TO WATER HEATER/FURNACE ONLY OK SEE NOTE #1 & #4 AND COMPLY FROM 5/21/07 INSPECTION CALL IN 03050 & 03090 FOR REINSPECTION GAS CARD AT METER |
|
| 05/21/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE #4 OR #6 BONDING WIRE WITH CLAMPS TO CLEAN AREA ON GAS PIPE & CLAMP ON COLD SIDE OF WATER PIPING. 2. GAS PIPING TO FIREPLACE IS REQUIRED TO BE SCOTCHCOATED WITH PRIMED & TAPED FITTINGS UNDERGROUND AND ABOVE GROUND PIPING SHALL BE 3 1/2 ABOVE FINISH GRADE WITH NO TRIPPING HAZARD. GAS VALVE IS REQUIRED TO BE OUTSIDE OF HEARTH WITHIN 6' OF HEARTH IN SAME ROOM AS FIREPLACE. NO LIVE GAS PIPING INTO FIREPLACE CLEANOUT TROUGH OR HEARTH BEFORE APPROVED GAS SHUT OFF VALVE. 3. TRANSITION FITTING FOR FURNACE VENT FROM SINGLE WALL TO DOUBLE WALL 4" X 5" TO BE MADE UP CORRECTLY. 4. VENT FROM FURNACE SHALL BE 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE WITH DOUBLE WALL VENT PIPE & CAP. |