Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/04/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/03/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL DUAL INLET WASHER BOX TO RECEIVE DISCHARGE FROM SOFTENER. 2. PROVIDE 1" AIR GAP. 3. PIPE TANK OVERFLOW TO EXTERIOR 4. REMOVE EXCESS FLUX FROM PIPING 5. REFER TO UPC INSTALLATION STANDARDS FOR COPPER TUBE INSTALLATION REQUIREMENTS. REINSTALL CLEANOUT FITTINGS FOR WASHER, NEVER LEAVE OPEN SEWER PIPING. CLEANOUT SHALL BE WATER & GAS TIGHT. |