Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PLEASE SAVE THIS INSPECTION SHEET, AS SOON AS THE CORRECTIONS ARE MADE TO YOUR WATER HEATER PERMIT AND INSPECTION AND APPROVED I CAN GIVE YOU A GAS CLEARANCE CARD. PLEASE LEAVE A CONTACT PHONE # IF YOU WISH TO BE CONTACTED ON DAY OF WATER HEATER INSPECTION. |
|
| 06/07/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTE #5 THIS INSPECTION SHEET ROOF TOP GAS PIPING BLOCKS TO BE SECURED TO EACH OTHER AND MASTIC APPLIED TO CONNECT TO ROOF. |
|
| 05/30/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* TEST FROM METER TO WATER HEATER, AC/HEATING UNIT ON ROOF & STOVE PARTIAL APP. NEW WATER HEATER HAS PERMIT, PLEASE CALL IN THAT PERMIT FOR INSPECTION WITH THIS PERMIT. 1. SHALL PROVIDE BONDING OF BUILDING GAS SYSTEM 2. SHALL PROVIDE AGA OR CSA APPROVED GAS VALVE FOR STOVE. 3. SHALL PROVIDE CORRECT VENT THRU ROOF AND APPROVED VENT CAP FOR NEW WATER HEATER. 4. SHALL PROVIDE SEDIMENT TRAP FOR WATER HEATER AT GAS ENTRY. 5. SHALL SUPPORT ROOFTOP GAS PIPING CORRECTLY 6. SHALL PROVIDE COMBUSTION AIR FOR WATER HEATER |