Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/03/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE TEST USING A GAUGE WITH 1/10TH PSI WITHIN INCREMENTATION IN ORDER TO ENSURE LINE TIGHTNESS A REASONABLE AMOUNT OF TIME. PSI HAS DROPPED 1 PSI WITHIN AN HOUR ACCORDING TO OWNER. 2. SUPPORT HORIZONTAL PIPING AT EACH END 3. USE LISTED PIPE COUPLINGS AND FITTINGS 4. LISTED ROOF FLASHING REQUIRED AT ROOF PENETRATIONS 5. PIPE T&P DRAIN TO EXTERIOR OR INTO EXISTING STAND PIPE AT FURN CONDENSATE DRAIN, PROVIDE A 1" AIR GAP AND USE APPROVED MATERIAL FOR HW. |
|
| 05/01/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE PRESSURE TEST ON ALL GAS PIPING 2. PROVIDE SUPPORT ON ROOF FOR ALL GAS PIPING 3. PROVIDE ROOF JACKS FOR GAS PIPING THRU ROOF 4. LIST MAY NOT BE COMPLETE 5. PROVIDE 1" CLEAR AROUND FLUE VENT FOR FURNACE |