Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 10 PSI TEST NEW PIPING FROM METER TO WATER HEATER/FURNACE ONLY |
|
| 04/19/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. GAS PIPING TO FIREPLACE SHALL BE TESTED THRU APPROVED GAS VALVE INTO HEARTH OF FIREPLACE. SHUT OFF VALVE SHALL IN SAME ROOM WITHIN 4' OF HEARTH OF FIREPLACE OR PIPING SHALL BE REMOVED FROM ENTIRE SYSTEM. 2. SHALL PROVIDE BONDING OF BUILDING GAS PIPING. RETEST SYSTEM & CALL BACK IN FOR INSP. |
|
| 04/18/2007 | PLUMBING - GAS PRESSURE TEST | Cancelled | CANCELLED PER AMANDA OF APPERSON PLUMBING #623-8441 | |
| 04/18/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | CANCELLED |