Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEMPERATURE AND PRESSURE RELIEF DRAIN SHALL GRAVITY DRAIN TO DAY LIGHT TERMINATE 6"-24" FROM FINISH GRADE ELEVATION WITH 90 DEGREE DOWN 2) VENT PIPING SHALL HAVE 3-GAL SCREWS AT EACH JOINT, HAVE MINIMUM 1" CLEARANCE FROM DBL WALL VENT PIPING AT COMBUSTIBLE MATERIAL AT ROOF, HAVE CORRECT VENT MATERIAL AND TERMINATE WITH APPROVED VENT CAP |