Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/17/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ALL ANGLE STOPS TO BE PROPERLY SECURED. 2. PROVIDE MINIMUM 18" OF COPPER PIPING AT WATER HEATER LOCATION. 3. SECURE VALVES FOR WASHING MACHINE SUPPLIES 4. PROVIDE LADDER TO ACCESS CEILING SPACE NOTE: ALL PIPING TO BE SUPPORTED AT 32" INTERVAL ATTIC PIPING TO BE BELOW INSULATION TO AVOID FREEZING. |