Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2007 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 04/04/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. GAUGE READING 2 PSI CHECK FOR LEAKS 2. ACCESS TO PIPING AND APPLIANCES NEEDED FOR INSPECTION. 3. SECURE PIPING W/PIPE CLAMPS WHERE EXPOSED PIPING IS NOT PROPERLY SUPPORTED 4. FLASHINGS REQUIRED AT ROOF PENETRATION 5. HORIZONTAL PIPING ACCESS ROOF SHALL BE 3 1/2" ABOVE ROOF. 6. CORRECT PIPING AT FURNACE, REMOVE TEE & PLUG VALVE 7. PROVIDE ELECTRICAL BONDING THIS IS NOT A RECONNECT ONLY |