Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/29/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE CORRECT COMBUSTION AIR FOR 40,000 BTU'S 2. TEMPERATURE & PRESSURE RELIEF SHALL HAVE APPROVED DRAIN PIPING TERMINATING AT 90 DEG. DOWN 6"-24" FROM FINISH GRADE, GRAVITY DRAINING TO EXTERIOR OF BUILDING 3. SHALL PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT PIPING. DOUBLE WALL VENT PIPING SHALL PENETRATE THRU ROOF WITH APPROVED ROOF FLASHING & APPROVED VENT CAP. |