Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL HAVE RIDGID PIPING INTO (THRU) ENCLOSURE FOR GAS SUPPLY. 2. VENT TO BE DOUBLE WALL FROM EXIT OF ENCLOSURE TO TERMINATION MINIMUM 1' ABOVE ROOF WITH APPROVED DOUBLE WALL VENT CAP. 3. NO COMBUSTIBLE MATERIAL SHALL BE WITHIN 6" OF SINGLE WALL AND 1" OF DOUBLE WALL VENT PIPING. 4. SHALL PROVIDE 3-GALV SCREWS AT VENT PIPING JOINTS. 5. SECURE ENCLOSURE TO WALL OR PAD NOTE: REMOVE THE TOWER FROM WITHIN 6" OF WATER HEATER PIPING, THIS IS A RISK FOR FIRE. |