Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD ON PIPE AT METER |
|
| 03/26/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE LIST FROM 3/22/07 #2 & #7 |
|
| 03/23/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* PIPING IN ATTIC SECURED OK COMPLETE OTHER ITEMS ON 3/22/07 SHEET |
|
| 03/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE BONDING OF BUILDING GAS PIPING. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN 6"-24" FROM FINISHED GRADE. 3. WATER HEATER VENT PIPING TO BE APPROVED MATERIAL (SINGLE WALL IN CLOSET) WITH 3 - GALV SCREWS AT EACH JOINT. TRAVELING IN UP DIRECTION. 4. SHALL PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO WATER HEATER & FURNACE. 5. SHALL PROVIDE COMBUSTION AIR FOR WATER HEATER CLOSET. 6. SHALL PROVIDE ACCESS (LADDER) TO ATTIC FOR INSPECTION. 7. SEAL PIPE PENETRATIONS INTO BUILDING |
|
| 03/20/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO ONE ON SITE UNABLE TO DO INSPECTION |