Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD AT METER |
|
| 03/15/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* READ ALL NOTES & COMPLY FROM PAST INSPECTIONS YOUR TEST IS NOT HOLDING FAILURE TO COMPLY WILL RESULT IN REFEE |
|
| 03/14/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #1 & 2 FROM 3/9/07 INSPECTION NOTE: BONDING IS DIFFERENT FROM GROUNDING. 2. FLASHINGS TO BE MADE WEATHERPROOF AND PROVIDED WITH WEATHER RESISTANT SCREWS, MADE WEATHERPROOF (DRYWALL SCREWS WILL RUST OUT) PROVIDE WEATHERPROOF SCREWS IN CLAMPS FOR PIPING. SEAL 360 DEG. AROUND PIPES THRU PARAPET WALL |
|
| 03/09/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PIPING ON ROOF TO BE SUPPORTED BY BLOCKS THAT ARE SUPPORTED BY ROOF WITH MASTIC 2. PROVIDE BONDING OF BUILDING GAS PIPING 3. IF A FUTURE TEE IS DESIRED AT ROOFTOP GAS ISOMETRIC SHALL REFLECT FUTURE TEE CONNECTION 4. SHALL SEAL & FLASH PIPING THROUGH PARAPET WALL ON ROOF. |