Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/23/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. BATHROOM ROUGH-SOIL OK 2. REPAIR LEAK ON PIPING FROM TWO-WAY CLEANOUT OUTSIDE TO HCS PROVIDE TEST AND CALL BACK FOR INSPECTION. |
|
| 03/21/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE APPROVED FITTING FOR UNDERGROUND PIPING AND INSTALL PIPING. 2. AT SUPPORT FOR WATER PIPING FOR WATER CLOSET AND WATER HEATER. |