Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* FAILURE TO COMPLY WITH PAST INSPECTION REQUEST WILL RESULT IN REFEE |
|
| 01/25/2008 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 01/07/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/29/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEST ON PIPING TO BE IN PLACE AT TIME OF INSPECTION. 2. PROVIDE CITY APPROVED GAS ISOMETRIC OF GAS SYSTEM, NOTE FUTURE CONNECTIONS TO BE SHOWN IF DESIRED OR REMOVED FROM SYSTEM FOR COMMERCIAL BUILDINGS. 3. HAVE NEW MECHANICAL UNIT INSPECTED & APPROVED FOR GAS CARD 4. NEW WATER HEATER TO BE ADDED TO THIS PERMIT AND SUPPLIED WITH CORRECT COMBUSTION AIR WITH VENT HAVING 1" MINIMUM CLEARANCE FROM COMBUSTIBLES. 5. PROVIDE BONDING OF BUILDING GAS PIPING 6. FOR YOUR SAFETY CAP ALL SANITARY DRAINAGE OPENINGS THAT ARE NOT PROPERLY TRAPPED 7. OBTAIN CORRECT CERTIFICATE OF OCCUPANCY FOR THIS BUILDING FROM 201 N. STONE 8. SUPPORT ALL PIPING PROPERLY LIST MAY NOT BE COMPLETE |
|
| 02/26/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES ABOVE & COMPLY. IT APPEARS YOU ARE DOING ADDITIONAL PLUMBING WORK HERE WITHOUT PERMITS & INSPECTIONS. PLEASE PROVIDE CITY APPROVED PLANS & PERMITS FOR THIS WORK. YOUR WATER HEATER WILL NEED TO BE INSTALLED CORRECTLY & COMPLETELY TO RECEIVE GAS CLEARANCE CARD. LIST NOT COMPLETE |
|
| 02/16/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE DRAWING FOR GAS PIPING APPROVED BY CITY OF TUCSON. 2. PROVIDE PERMIT FOR NEW GAS PACK UNIT |