Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/20/2007 | PLUMBING - FINAL | Cancelled | ||
| 03/19/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/12/2007 | PLUMBING - FINAL | Cancelled | ||
| 03/05/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/01/2007 | PLUMBING - FINAL | Cancelled | CANCELLED PER MIKE | |
| 02/22/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTINUED NOT READY WILL RESULT IN A REINSPECTION FEE FAV ALSO REQUIRES A SEDIMENT TRAP |
|
| 02/21/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/15/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ROOF FLASHINGS TO BE MADE WATER TIGHT. 2. PIPING ON ROOF TO BE MINIMUM 3 1/2" ABOVE ROOF AND SUPPORTED AT CORRECT INTERVALS WITH BLOCKING MASTICED TO ROOF. 3. WATER HEATER T&P DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT. 4. GAS PIPING IS UNDERSIZED PROVIDE CORRECTLY SIZED GAS SYSTEM FOR 205,000 BTU DEMAND AT 50' 5. PROVIDE UPPER COMBUSTION AIR OPENING FROM OUTSIDE SOURCE EQUAL TO 40,000 BTU DEMAND FOR WATER HEATER 6. SECURE GAS AT STOVE |