Permit: T07PL00312

Parcel: 126133100


Addresses:

4509 E MONTECITO ST

Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
04/23/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
03/19/2007 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
NO CHANGE COMPLETE WORK
03/16/2007 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
4509 & 4511 PRESSURE TEST OK
4509 -- GAS CARD ON SITE
4511 --
1. COMPLETE WATER HEATER INSTALL CORRECTLY.
2. PROVIDE BONDING
3. SEE NOTES FROM 3/6/07 INSPECTION.
03/12/2007 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
#4511 -- STILL NO TEST - NO CHANGES WORK NOT COMPLETED
#4509 -- WORK NOT COMPLETED
COMPLETE ALL WORK REQUIRED, THAT IS LISTED ON THIS INSPECTION SHEET OR YOU COULD BE REFEED
03/08/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
4511 E MONTECITO --SEE NOTES ABOVE & PROVIDE TEST ON THIS UNIT
RESULTS & ALL NOTES ON 4509 E. MONTECITO ST

4509 E MONTECITO -- SEE ALL NOTES ON INSPECTION SHEET & COMPLY. YOU SHALL COMPLETE WORK LISTED ON A UNIT TO OBTAIN GAS CLEARANCE CARD. UNIT #4509 TEST IS HOLDING, COMPLETE OTHER ITEM LISTED ABOVE & SUPPORT PIPING AT WATER HEATER FURNACE ARE AS REQUESTED.
03/06/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
UNIT 4509
1. TEST SHALL BE IN PLACE AND HOLDING WITH NO LOSS OF PRESSURE.
2. PROVIDE CORRECT GROUNDING OF ELECTRIC PANEL AND BONDING OF BUILDING GAS PIPING.
3. SUPPORT ALL PIPING CORRECTLY.

UNIT 4511
1. SHALL HAVE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES.
2. WATER HEATER TO BE INSTALLED CORRECTLY IF NEW WATER HEATER IS DESIRED HAVE IT ADDED TO PERMIT
3. ALL PIPING TO BE SUPPORTED CORRECTLY.
4. WATER HEATER VENT TO BE APPROVED VENT MATERIAL THRU CEILING AND ROOF TERMINATING MINIMUM 2' ABOVE AIR INTAKES FOR BUILDING WITH APPROVED VENT CAP.
5. PROVIDE BONDING OF BUILDING GAS PIPING
6. SEAL ALL PIPE PENETRATIONS INTO BUILDING
03/01/2007 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. ADDRESS MUST MATCH ACTIVITY SHEET
2. ADDRESS POSTED IS 4509 EITHER CHANGE ADDRESS ON PERMIT OR ON BUILDING.
3. ALL PIPING SHALL BE SUPPORTED CORRECTLY AT CORRECT INTERVALS.
4. PROVIDE BONDING OF BUILDING GAS PIPING
5. GAS PIPING TO BE 3 1/2" MINIMUM ABOVE GRADE
6. TEST TO BE IN PLACE