Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/06/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL SUPPORT AND SECURE GAS PIPING AT DROP TO METER AND 90 DEGREE UP THRU ROOF 2) SHALL PROVIDE ROOF FLASHING AT PIPE PENETRATION THRU ROOF 3) SHALL SUPPORT GAS PIPING MINIMUM 3 1/2" ABOVE ROOF WITH WEATHER RESISTANT MATERIAL AND SECURE PIPING TO SUPPORTS 4) FUTURE TEES REQUIRE CITY APPROVED GAS ISOMETRIC PLANS. PROVIDE THIS PLAN OR REMOVE TEE ON ROOF FROM SYSTEM. IF THIS TEE IS NECESSARY COMPLETE ALL PIPING TO VERIFY GAS PIPE SIZING WILL MEET BTU DAMAND 5) PROVIDE WORKING TEST GAUGE IN 1/10 POUND INCREMENTS |