| 02/28/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1. CONTRACTOR HAS SECURED PERMIT FOR ROOFTOP UNIT 2. CORRECTIONS MADE OK OK FOR GAS UCC LEFT AT METER SW GAS 889-1888 |
|
| 02/08/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/06/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEW ROOF TOP GAS PACK INSTALLED-BUT NOT INSPECTED. WILL REQUIRE APPROVED GAS PLAN-SHOWING DEVELOPED LENGTH AND BTU CONSUMPTION 2) WILLL REQUIRE SEDIMENT TRAP AT UNIT AND PROPER SUPPORT FOR PIPE 3) ARE FLEXES RATED FOR BTU'S ? |
|