Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T07PL00173
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
02/12/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1" STUB UP AT POOL HEATER AND OVER TO TANK LOCATION 20 PSI TEST GAS CARD LEFT TO DROP STORAGE TANK ONLY 1. SHALL SEE CONNECTION TO TANK & HEATER WITH SOME FORM OF TEST TO FINAL. 2. SHALL SEE OK FROM TUCSON FIRE INSPECTOR. |
|
02/06/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) SHALL PROVIDE CONNECTION TO POOL HEATER 2) SHALL PROVIDE PRIMER AND THEN TAPE ON ALL TOOL MARKS AND UNDERGROUND FITTINGS 3) NO FUTURE TEE CONNECTIONS SHALL BE ALLOWED 4) ALL UNDERGROUND PIPING SHALL BE FACTORY COATED-RETEST PIPING 5) WILL NEED TO SEE COMPLETED INSTALL WITH POSSIBLE GAS PRESSURE TEST FINAL TO APPROVE |