Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/29/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE 90 DEG. PIPING UP AT METER LOCATION WITH PIPE PRIMER THEN 10 MIL TAPE AT ALL UNDERGROUND FITTINGS & TOOL MARKS. 2. PROVIDE TEST ON ENTIRE SYSTEM 3. PROVIDE ROOF FLASHINGS AT PENETRATIONS THRU ROOF 4. VENTS FROM WATER HEATER & FURNACE TO BE MADE UP CORRECTLY WITH 3-GALV SCREWS AT EACH JOINT AND BE EXTENDED UP TO 2' ABOVE TOP OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING AND APPROVED CAP WHEN WITHIN 10' OF INTAKE. 5. PROVIDE CLEARANCE FOR STOVE GAS PIPING 6. WATER HEATER TEMPERATURE & PRESSURE RELIFE SHALL GRAVITY DRAIN IN DOWNWARD DIRECTION. 7. PROVIDE BONDING CLAMPS WITH #4 COPPER WIRE FOR BONDING. |