Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* OK TO CONNECT NEW INSTA HOT TO EXISTING GAS SYSTEM METER IS ON CLEARANCE TAG GIVEN |
|
| 02/06/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE WARNING LABEL ON FRONT OF HEATER OR SEE PAGE 41 2) PROVIDE THE MINIMUM 36" OF CLEARANCE FROM COMBUSTIBLE MATERIALS TO TOP OF HEATER 3) IS GAS PIPING BONDED TO ALL METALIC PIPING SYSTEM ? IF NOT BOND TO PANEL |
|
| 01/25/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* WH INSTALLATION DOES NOT MEET REQUIRED CLEARANCE FROM COMBUSTIBLES. PROVIDE INSTALLATION INSTRUCTIONS PROVIDE ELECTRICAL BONDING FLEX NOT RATED FOR 190,000 BTU PRESSURE TEST OK |
|
| 01/23/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. IVR SYSTEM DOWN UNABLE TO ACCESS MESSAGE 2. NOBODY HOME REINSPECTED PLEASE DO NOT MAX OUT PRESSURE GAUGE TEST IN THE MID-RANGE OF THE GAUGE REMOVE 90 DEG. ELL AT BOTTOM OF T&P RELIEF DRAIN PROVIDE ACCESS TO ROOF APPROVED VALVE AT STOVE AGA CSA WATER HEATER AND FURNACE REQUIRE SEDIMENT TRAPS WATER LINE REPIPE REQUIRES A PERMIT PROVIDE LISTING FOR GLK PLASTIC PROVIDE HAMMER ARRESTORS AT LAUNDRY. |