Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/19/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL UNDERGROUND PIPING SHALL BE FACTORY COATED TO PROTECT FROM RUST. 2. TEST GAUGE TO BE IN 1/10 POUND INCREMENTATIONS. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL BE FULL SIZE RIDGID APPROVED PIPING (NO FLEX KINKED) GRAVITY DRAN TO DAYLIGHT. 4. VENT FROM WATER HEATER TO HAVE 3-GALV SCREWS AT EACH JOINT. 5. PROVIDE CORRECT COMBUSTION AIR FOR WATER HEATER. 6. PROVIDE #4 BONDING WIRE. 7. SEAL ALL PIPE PENETRATION INTO BUILDING. 8. SHALL PROVIDE ROOF FLASHING FOR PIPE PENETRATION THRU ROOF. |