Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/16/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* BUILDING DRAIN IS 4", BUILDING SEWER IS REQUIRED TO BE 4", TEST TO BE IN PLACE, WITH MINIMUM 1/4" PER FOOT FALL SEE NOTES FROM 2/15/07 |
|
| 02/15/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* BUILDING DRAIN IS 4" 4" BUILDING SEWER SHALL BE REQUIRED EXPOSE SEPTIC TANK TO VERIFY NOTE #2 FROM 2/9/07 INSPECTION. REMOVE DIRT AT COUPLING FOR HCS TO VIEW AND HAVE TEST ON PIPING FOR INSPECTION. |
|
| 02/09/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. EXPOSE CONNECTION AT HCS 2. REMOVE 3" X 2" WYE PUMP SEPTIC TANK AND SHOW EVIDENCE THAT THE BOTTOM & OR SIDES ARE BROKEN. 3. CONTRACTOR TO SHADE PIPING WITH CLEAN FILL 4. YOU MAY WANT TO RECHECK YOUR GRADE REQUIRE 2% FOR ITS ENTIRE LENGTH. |