Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/18/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 12 PSI TEST ON EXISTING SYSTEM REPAIR AT BUILDING RISER ONLY 1. SHALL PRIME & THEN 10 MIL TAPE PIPING AT RISER LOCATION. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL BE FUNCTIONAL AND GRAVITY DRAIN TO DAYLIGHT TERMINATIONS MAXIMUM 24" FROM FINISH GRADE. 3. SEAL PIPE PENETRATION INTO BUILDING. |