Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T07PL00076
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD AT METER |
|
01/29/2007 | PLUMBING - FINAL | Cancelled | PER LINDA | |
01/25/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE DOUBLE WALL VENT FROM INSIDE WATER HEATER ENCLOSURE TO POINT OF TERINATION WITH APPROVED DOUBLE WALL VENT CAP AT EXTERIOR WATER HEATER. NO FLAMMABLE MATERIAL WITHIN 1" OF VENT PIPING. 2. SHALL PROVIDE FUNCTIONAL TEMPERATURE & PRESSURE RELIEF DEVICE WITH APPROVED DRAIN MATERIAL FOR EXTERIOR WATER HEATER. 3. INTERIOR WATER HEATER SHALL HAVE 90 DEG. DOWN TERMINATION FOR TEMPERATURE & PRESSURE RELIEF ON EXTERIOR. SHALL HAVE 3-GALV SCREWS AT ALL JOINTS OF VENT PIPING, SHALL BE DOUBLE WALL THRU ROOF WITH 1" MINIMUM CLEARANCE FROM COMBUSTIBLES. PROVIDE ROOF JACK AT ROOF PENETRATION AND APPROVED VENT CAP TERMINATING 2' ABOVE, TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. 4. PROVIDE SUPPORT AT TEE INTERSECTION ON ROOF WITH CORRECT CLAMPS TO SECURE PIPING TO BLOCKS AND ROOF MASTIC TO SECURE BLOCKS TO ROOF. 5. SUPPORT & SECURE GAS PIPING AT INSIDE WATER HEATER LOCATION. 6. PROVIDE CORRECT COMBUSTION AIR FOR INSIDE WATER HEATER. 7. PROVIDE SEDIMENT TRAP AT NEW FURNACE. 8. FURNACE VENT TO BE MINIMUM 2' ABOVE TOP OF COOLER INTAKE & COMBUSTION AIR INTAKE WHEN WITHN 10' OF INTAKE WITH DOUBLE WALL VENT PIPING & CAP. 9. SHALL PROVIDE BONDING OF BUILDING GAS PIPING. NOT READY |