Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/09/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE PRESSURE TEST USING A GAUGE WITH 1/10 PSI INCREMENTATIONS. 2. THIS GAS LINE SUPPLIES A FAV ONLY. REMOVE OTHER TEES (2) IN LINE. 3. PRIMER AND WRAP ALL TOOL MARKS BELOW GRADE - HORIZONTAL PIPING. 4. ABOVE GRADE IS REQUIRED TO BE 3 1/2" ABOVE GRADE. 5. THREAD PROTECTORS ARE NOT PIPE COUPLINGS - USE LISTED COUPLINGS. 6. SUPPORTS ON ROOF NEED TO BE WEATHER RESISTANT 7. FLEX AT FURNACE IS UNDERSIZED. |