Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/26/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/25/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/22/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* SHALL PROVIDE TEST ON ENTIRE GAS SYSTEM SEE NOTES FROM ABOVE INSPECTION & COMPLY OR YOU SHALL BE REFEED |
|
| 01/09/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 25 PSI TEST ON EXISTING YARD PIPING REPLACE OLD SHUT OFF VALVE AT STOVE, RELOCATE AND REPLACE VALVE FOR WALL FURNACE. REPRESSURE TEST ENTIRE SYSTEM ADD REPLACE WH TO PERMIT WH SHALL BE INSTALLED PRIOR TO GAS SERVICE CONCRETE PAD, ENCLOSURE, VENTING, T&P, NEW FLEX AND SEDIMENT TRAP REQUIRED. PROVIDE ELECTRICAL BONDING. |