Permit: T07OT01964

Parcel: 10706043B

Inspection Status: Approved

Inspection History: ELECTRIC - PROGRESS

Permit Number - T07OT01964

Inspection Description - ELECTRIC - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
09/14/2007 ELECTRIC - PROGRESS Approved OK PER NOTES FROM PREVIOUS INSP.
09/07/2007 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
CHECK EXISTING ELECTRIC FOR LIFE/SAFETY ISSUES

1. THIS STRUCTURE HAS ELECTRICAL WORK BEING DONE UNDER SEPARATE PERMIT THAT HAS NOT BEEN FINALED YET
2. HAVE OPEN WIRING THROUGHOUT ON INTERIOR AND EXTERIOR OF STRUCTURE, IE MISSING FIXTURES, MISSING COVERS, OPEN J-BOXES, ETC.
3. BATHROOM RECEPTACLES NOT GFI PROTECTED
4. HAVE RECEPTACLES THAT ARE LOOSE/SET BACK IN WALL
5. HAVE SEVERAL LIGHT FIXTURES MISSING BULBS/COVERS
6. EXISTING PANELS HAVE OPEN BREAKER SPACES, DIRECTORIES NOT MARKED
7. HAVE OPEN ENERGIZED ROMEX UPSTAIRS
8. STAIR 3-WAY SWITCH NOT WORKING
9. EMERGENCY LIGHTING NOT WORKING, OPEN ENERGIZED SPLICES THROUGHOUT - STRUCTURE NOT SAFE TO OCCUPY RECOMMEND ELECTRICAL CONTRACTOR GO THROUGH AND MAKE SAFE. INSPECTION TIME 45 MIN.